1. Servicing the major overhaul of TG-1; 2002.
2. Servicing the generator exchange; 2007.
1. Installation of turbo set TG-3 (100MW).
2. Repair of turbo set TG-3 (100MW).
3. Measuring relative dislocations of TG-2; 1995 and 1996.
Measurements of relative vertical dislocations of a turbogenerator (1993-end of 1998).
1. Repairs of turbines in the 1980s and 1990s (non-stop).
2. Current repairs of turbo sets TG-1, TG-2 and TG-3 (200 MW).
3. Current major overhauls of medium-power turbo sets at Ostrołęka A.
4. Modernization of turbines TG-1 and TG-3 for Westinghouse.
1. Current major overhauls of turbo sets TG-1, TG-2 (120 MW) and TG-9, TG-10, TG-11, TG-12 (215 MW).
2. Overhaul and modernization of TG-9, TG-10, TG-11 and TG-12 blocks; 1995-2000, for Alstom Power (former Zamech, ABB Zamech, ABB Alstom).
3. Measurements of the spatial position of the condenser walls on TG-9 and TG-11.
4. Constant diagnostic measurements of all turbines.
1. Overhaul and modernization of TG-1 and TG-2.
2. Installation of turbines WK-100-6M -TG-3, TG-4, TG-5, TG-6; 1993-1996.
1. Overhaul and modernization of turbo sets TG-1, TG-2, TG-3, TG-4, TG-5 and TG-6.
2. Regular diagnostic measurements of shaft alignment of turbo sets TG-1, TG-2, TG-3, TG-4, TG-5 and TG-6 and the foundations and reference points on TG-1 and TG-2.
3. Major overhauls of all turbo sets.