Dobczyce hydroelectric power plant

Diagnostic measurements of shaft alignment on hydrosets; 1995.

Bielsko I heat and power plant

1. Installation of turbo set 13UP55; 1996.
2. Diagnostic measurements of shaft alignment since 1997.

Petrochemia Płock heat and power plant

1. Repair TG-6; 1996
2. Repair FE 50 – Olefiny II; 2001

Kopin and Nysa hydroelectric power plants

1. Monitoring the subsiding of the foundations of buildings and turbines at the Nysa plant; 1992-1993.
2. Shaft and gear aligning during repair at the Kopin plant; 1995/96.
3. Shaft and gear aligning during repair at the Nysa plant; 1999/2000.

Szopienice steelworks

Measuring and setting the rollers in rolling mills on new technological lines.

Przyjaźń coking plant, Dąbrowa Górnicza

1. Measuring and setting compressors.
2. Measuring the changes of bearing positions on the TG-2 turbo set.

Chorzów nitric plant

Measuring and setting compressors.

Brzeg Dolny chemical plant

Installation of a 30MW turbo set.

Białystok SA heat and power plant

1. Measuring the relative vertical dislocations of turbogenerators TG-1, TG-2 and TG-3 and analysing the changes of shaft alignment and foundation plate dislocations (continuously since 1993).
2. Measurements of relative dislocations of fresh-steam pipelines, TG-3; 1995.
3. Major overhauls of turbo sets TG- 3; 1998, TG-1; 1999.
4. Levelling and diagnostic measurements of the new turbo set TG-4; 2005 and 2006.
5. Repair measurements of turbine TG-2; 2001.

"Stomil" Olsztyn heat and power plant

1. Measuring the relative vertical dislocations of the turbogenerator and analysing the changes  of shaft alignment; 1994-1999.
2. Servicing routine repair; 1994-1999.
3. Major overhaul with diagnostic measurements; 2009.

Pages