Diagnostic measurements of shaft alignment on hydrosets; 1995.
1. Installation of turbo set 13UP55; 1996.
2. Diagnostic measurements of shaft alignment since 1997.
1. Monitoring the subsiding of the foundations of buildings and turbines at the Nysa plant; 1992-1993.
2. Shaft and gear aligning during repair at the Kopin plant; 1995/96.
3. Shaft and gear aligning during repair at the Nysa plant; 1999/2000.
Measuring and setting the rollers in rolling mills on new technological lines.
1. Measuring and setting compressors.
2. Measuring the changes of bearing positions on the TG-2 turbo set.
1. Measuring the relative vertical dislocations of turbogenerators TG-1, TG-2 and TG-3 and analysing the changes of shaft alignment and foundation plate dislocations (continuously since 1993).
2. Measurements of relative dislocations of fresh-steam pipelines, TG-3; 1995.
3. Major overhauls of turbo sets TG- 3; 1998, TG-1; 1999.
4. Levelling and diagnostic measurements of the new turbo set TG-4; 2005 and 2006.
5. Repair measurements of turbine TG-2; 2001.