A LIST OF THE MACHINES INSTALLED,  REPAIRED OR MODERNIZED
USING THE OPTICAL METHOD WITH THE PARTICIPATION OF OUR WORKERS.

Our biggest challenge over the last few years was full service of the installation of modern power units in Poland and abroad:
- 865MW unit at Bełchatów II power plant (2008-2009),
- 460MW unit at .Łagisza power plant (2007-2008),
- 460MW unit (steam-gas) at Thiva, Greece, power plant (2009),
- 32MW unit at Świecie power plant (2006),
- 198MW unit (steam-gas) at Zielona Góra power plant (2003),
- 95MW unit (steam-gas) at Rzeszów power plant (2002).

Połaniec power plant:

1. Installation of turbo sets TG-3, TG-4, TG-5, TG-6, TG-7, TG-8  (215MW each).
2. Modernization of successive turbo sets (8 blocks in total) to increase efficiency and power to 230MW; from 1992 to end of 1998
3. Repairing and setting PCH pumps.
4. Repairs of modernized turbo sets TG-1, TG-2, TG-3 and TG4.

Rybnik power plant:

1. Installation of turbo sets TG-5, TG-6, TG-7 and TG-8 (215MW each; II stage of power-plant construction).
2. Measurements of deformations of turbines TG-1, TG-2, TG-4, TG-6, TG-7, TG-8.
3. Major overhauls of all blocks.
4. Participation in modernizing the Westinghouse; 1996-2000.
All blocks. Optical installations of turbo sets and work on the condenser.

Jaworzno III power plant:

1. Installation of turbo sets TG-3, TG-4 and TG-5 (215MW each).
2. Measurements of the deformations of turbines TG-2, TG-3, TG-4, TG-5 and TG-6.
3. Optical measurements of turbo sets TG-6, TG-1, TG-2; 1994-1995.
4. Modernization of ABB Zamech turbo sets; 1995-1999.
5. Regular servicing of major overhauls.

Dolna Odra power plant:

1. Installation of turbo set TG-7 (215 MW).
2. Modernization of ABB Zamech turbo set TG-1 and TG-2 in 1996 and TG-3 in 1997.

Bełchatów I and II power plants:

1. Installation of turbo sets TG-1 and TG-2 (360MW).
2. Major overhauls and routine repairs of blocks TG-1 to TG-12 (last in 2008).
3. Installation of a new 865MW block in 2009.

 Pątnów power plant:

1. Exchange and installation of the TG-1 turbo set (215MW).

Kraków SA (Łęg ) power plant:

1. Installation of turbo sets TG-3 and TG-4 (110MW).
2. Current major overhauls of turbo sets TG-1, TG-2, TG-3 and TG-4.
3. Setting boiler burners in K-1 to K-4; 1994-2009.
4. Measurements of the actual position of the screen collectors on boilers K-2 and K-4.
5. Servicing the exchange and setting the blast and draught fans; 1994.
6. Servicing the exchange of dirt traps TG-4, TG-3, TG-2, TG-1.
7. Diagnostic measurements of shaft alignment of turbo sets TG-1, TG-2, TG-3 and TG-4; 1995-2009.
8. Measuring the exchanges at block Tg-1-4.
9. Measuring steam pipes following a breakdown in 2008.
10. Diagnostic measurements of gear TG-1 to TG-4.

Wrocław II power plant:

1. Installation of turbo sets TG-1 and TG-2 (100MW).
2. Modernization of turbo set TG-1; 2008.

Poznań II power plant:

1. Installation of turbo set TG-1 o mocy 65 MW.

Turów power plant:

1. Major overhaul of turbo set TG-5 (215MW).
2. Modernization of turbo set TG-9 (215MW; target power 230 MW); 1993
3. Modernization of turbo set TG-10; 1994.
4. Modernization of turbo set TG-8; 1995.
5. Major overhaul of TG-7; 1996.
6. Installation of new turbo sets No. 1 in 1997, No. 2 in 1998 and No. 3 in 1999 for ABB.
7. Current major overhauls.
8. Regular diagnostic measurements of shaft alignment, foundations, reference points of turbo sets TG-1 to TG-6.

   