References AFS - Pomiary Optyczne

Dobczyce hydroelectric power plant:

1. Diagnostic measurements of shaft alignment on hydrosets; 1995.

Kozienice power plant:

1. Installations of turbo sets in the 1970s.
2. Overhaul and modernization of 200MW blocks for ABB and Westinghause from 1996 to  1999.
3. Repair of TG-9 (500 MW).

Paper and cellulose plants in Klucze and Kwidzyń:

1. Measuring and setting the parallelism of the rollers in papermaking machines.
                                                           
EC Łódź II heat and power plant:

1. Major overhaul TG-1; 1997.
2. Installation of a new TG-4 turbine in 1998, repair in 2003.
3. Major overhaul TG- 7; 1998-2001.
4. Repair of a section of WP, TG-2 in 2001.
5. Diagnostic measurements of shaft alignment, TG-7; 1999-2001; and TG-2 in 2001.
6. Major overhaul of TG-5; 2005.
                                                           
EC Łódź III heat and power plant:

1. Overhaul and modernization of all turbo sets: TG-1, TG-2 and TG-3; 1996-1999.

EC Łódź IV heat and power plant:

1. Overhaul and modernization of turbo sets TG-1, TG-2 (55 MW).
2. Major overhaul of TG-3 (105 MW) in 1998 and routine repair in 2000.
3. Diagnostic measurements of TG-2 and TG-3.
4. Modernization of TG-2; 2006.

Gdańsk heat and power plant:

1. Overhaul and modernization of a 65MW block; 1998.
2. Major overhaul of a 55MW block in 2007.

Jaworzno II heat and power plant:

1. Installation of a new turbine TG-1; 1998.
2. Installation of a new turbine TG-2; 1999.
3. Overhaul and modernization of TG-1; 2000.     
4. Routine repairs and major oberhauls of TG-1 and TG-2.

IP Kwidzyn:

1. Major overhauls of TG-3 in 1998 and TG-2 in 1999-2000.
2. Diagnostic measurements of turbo sets TG-2 and TG-3; 1998-2000.

Tychy heat and power plant:

1. Installation of a new turbine TG-1; 1999 (for Skoda).
2. Current diagnostic and optical measurements during routine repairs.
                                                      
Szczecin SA heat and power plant

1. Installation of a 65MW turbo set (1999/2000) for ABB Alstom.

Solali papermaking plant, Żywiec:

1. Servicing remontów the repairs of papermaking machines MP 4 and MP 5.

Beskid papermaking plant, Wadowice:

1. Servicing papermaking machines – cardboard machines; 2007-2009.

Boxberg, Germany, heat and power plant:

1. Exchange and installation of turbo set TG-7 (500MW).

Prunerov II, Czech Republic, power plant:

1. Servicing the construction of engine room and boiler.
2. Installation of turbo sets TG-1, TG-2, TG-3, TG-4 and TG-5 (215MW each).
3. Repairs of turbo sets TG-1 to TG-5 from the opening of the plant to 2005.
4. Servicing the modernization and setting the burners in boilers K-1, K-2, K-3, K4 and K-5.
5. Resetting the rotating air heaters TG-2 and TG-3.
6. Specialist measurements during the modernization of boilers and ventilation ducts since 1995.
7. Modernization of turbo sets (for Skoda), boiler and ventilators since 1997.

Janschwalde, Germany, power plant:

1. Installation of turbo sets A-10, A-20, B-10, B-20, C-10, C-20 (500MW each).

Trbovlje, Slovenia power plant:

1. Overhaul and modernization of a 120MW block; 1996.

DEVA-Mintia, Romania, power plant:

1. Overhaul and modernization of turbo set K-200, block 3; 2001 and 2006.

Baltijskaja power plant, Narva, Estonia:

1. Overhaul and modernization of turbo set K-200, block 12.

Eesti power plant, Narva, Estonia

1. Overhaul and modernization of turbo set K-200, block 6.

Kemerkay, Turkey, power plant

1. Diagnostic measurements of TG-2 block.

Thiva, Greece, power plant:

1. Installation of TG-1 turbo set (460MW).

Matra, Hungary, heat and power plant:

1. Diagnostic measurements of 215MW blocks.

Vilnius, Lithuania, power plant:

Diagnostic and levelling measurements of turbo sets.