ZML Kęty SA:

1. Measuring and setting a hydraulic press; 2006.
2. Setting technological “tables” in 2007, 2008 and 2009.

 Łagisza I and II power plants:

1. Measuring the rotor axis on turbine TG-6; 1991.
2. Servicing the installation of a new 460MW turbine; 2007-2009.

Powiśle heat and power plant:

1. Repair of turbo set TG-11; 1996.

Stalowa Wola heat and power plant:

1. Installation of the TG-6 turbo set (40MW).
2. Major overhauls of the TG-5, TG-7 and TG-8 turbines.

ZP Świecie heat and power plant:

1. Routine repair of TG-4 in 1995.
2. Diagnostic measurements of TG-3 and TG-4; 1996 and 1999.
3. Diagnostic measurements of TG-4; 1997 and 1998.
4. Diagnostic measurements of TG-2; 2000.
5. Installation of a new TG-1 block; 2006.
6. Major overhaul of TG-2; 2008. 

"Stomil" Olsztyn heat and power plant:

1. Measuring the relative vertical dislocations of the turbogenerator and analysing the changes  of shaft alignment; 1994-1999.
2. Servicing routine repair; 1994-1999.
3. Major overhaul with diagnostic measurements; 2009.

 Białystok SA heat and power plant:

1. Measuring the relative vertical dislocations of turbogenerators TG-1, TG-2 and TG-3 and analysing the changes  of
shaft alignment and foundation plate dislocations (continuously since 1993).
2. Measurements of relative dislocations of fresh-steam pipelines, TG-3; 1995.
3. Major overhauls of turbo sets TG- 3; 1998, TG-1; 1999.
4. Levelling and diagnostic measurements of the new turbo set TG-4; 2005 and 2006.
5. Repair measurements of turbine TG-2; 2001.

Brzeg Dolny chemical plant:

1. Installation of a 30MW turbo set.

Rolling mill at the Katowice Steelworks:

1. Servicing the repair of the converter on the generating set No 2.
2. Repair of the TG-5 turbine (30MW); 1998.

Chorzów nitric plant:

1. Measuring and setting compressors.

Przyjaźń coking plant, Dąbrowa Górnicza:

1. Measuring and setting compressors.
2. Measuring the changes of bearing positions on the TG-2 turbo set.

Szopienice steelworks:

1. Measuring and setting the rollers in rolling mills on new technological lines.

Kopin and Nysa hydroelectric power plants:

1. Monitoring the subsiding of the foundations of buildings and turbines at the Nysa plant; 1992-1993.
2. Shaft and gear aligning during repair at the Kopin plant; 1995/96.
3. Shaft and gear aligning during repair at the Nysa plant; 1999/2000.

Petrochemia Płock heat and power plant:

1. Repair TG-6; 1996
2. Repair FE 50 – Olefiny II; 2001

Bielsko I heat and power plant:

1. Installation of turbo set 13UP55; 1996.
2. Diagnostic measurements of shaft alignment since 1997.